Bring construction site processes to life with just the push of a button
Try it now for free
Learn more
START YOUR FREE 4D SIMULATION NOW
We bring construction site processes to life and help you maintain an overview. Simple, fast, free of charge.
Learn more-
REGISTRATION
1Enter your login details and get access to specter
-
DATA UPLOAD
2Upload your IFC model and, if desired, integrate your existing schedule.
-
SIMULATION
3Plan tasks in specter and simulate the target construction progress
-
Use case: Work preparation
Creating 4D schedules or linking existing schedules to the IFC model has never been easier.
-
Use case: Construction site
Viewing your target progress at the touch of a button and knowing exactly what needs to be done at any given time has never been so easy and transparent.
-
Use case: Control
Tracking the construction process and identifying potential conflicts has never been so easy and straightforward.
Any questions?
-
Is the test really free?
Yes. After registering, you will receive free access to specter. This access is limited to 60 days.
-
Do I need my own 3D model?
Yes. You need an IFC model to get started with specter. There are no other data requirements.
-
How long does the setup take?
Once you have gained access, you can get started right away in specter: upload your IFC model and you can start scheduling immediately (or link an existing schedule to the model). The time required to create the schedule varies depending on the level of detail in the planning (component vs. floor level).
-
What limitations does the trial version have?
The trial version is valid for 60 days. If you are interested in continuing to use specter after this period, do not hesitate to contact us.